The size and substance of the premises at the Lüdenscheid fire and rescue station no longer met the requirements of a modern control centre. As part of a completely new construction project, the Märkischer Kreis Fire and Rescue Service Centre (BRZ MK) was built. The new control centre was also installed in this building.

Please click on the following link for the new video: https://www.youtube.com/watch?v=YW-en_c1KsQ